NASA Details Artemis III Tests With Two Moon Lander Vehicles

The planned 2027 Earth-orbit mission would dock Orion with Blue Origin and SpaceX test articles before a targeted 2028 lunar landing.

Published 2026-10-25 · MacroShed

NASA said on October 23, 2026, that it plans to dock the Artemis III crew’s Orion spacecraft separately with Blue Origin and SpaceX lander test articles in low Earth orbit. The roughly 14-day mission is planned for 2027. NASA announced in February that Artemis III would become an Earth-orbit test instead of a lunar landing; the October update specified how it intends to test both vehicles.

NASA has assigned astronauts Randy Bresnik, Frank Rubio and Andre Douglas, and European Space Agency astronaut Luca Parmitano, to the mission. Orion is planned to launch on NASA’s Space Launch System rocket. The crew’s work would give NASA flight data on Orion’s connections with two different commercial spacecraft before either provider carries astronauts to the lunar surface.

Three launches and two dockings

The planned sequence begins with a Blue Origin Blue Moon Mark 2 test article, followed by Orion and then a SpaceX Starship Version 3 test article. Orion would rendezvous and dock with each vehicle separately. Completing the plan depends on three vehicles being ready for their launches and on the crew completing both docking campaigns.

Astronauts are expected to enter the Blue Moon test article for approximately two days to evaluate its cabin and systems. The planned Starship docking test would last up to two hours, without astronauts entering Starship. Those different activities limit what the mission can establish about each vehicle’s readiness for crewed flight.

Amid the coordinated launches, the mission would test docking, communications, software and the behavior of connected vehicles in flight. These operations would provide evidence about Orion’s interfaces with both landers. They would not reproduce the travel, landing and departure operations required for a crewed lunar mission.

Requirements for a lunar landing

NASA targets Artemis IV for a crewed landing near the lunar south pole in 2028. Under its realigned lander contracts, NASA has not assigned either Blue Origin or SpaceX a specific landing mission. It says the provider ready to fly will determine which lander carries the first Artemis crew to the lunar surface.

Both providers must complete an uncrewed demonstration with their crewed landers before near-term crewed lunar missions, and NASA must certify the lander systems. The revised concepts also retain in-space propellant aggregation for SpaceX and call for three transfer stages for Blue Origin. Successful Earth-orbit dockings would leave those development and approval requirements in place.

The 2027 test sequence and 2028 landing remain plans rather than completed milestones. It is uncertain whether all three Artemis III vehicles will be ready in time, whether both dockings will succeed and which provider could be ready for Artemis IV. Those questions affect when NASA can move from interface testing to a crewed landing.

The financial effects of the revised architecture also remain unsettled. In a March 2026 report, NASA’s inspector general said it had not evaluated the cost and schedule effects of the February change. A subsequent Government Accountability Office assessment said human-landing-system cost and schedule estimates were under review.

Sources

Explore the economic concepts behind the news