The FCC authorized up to a million Starmind satellites. At SpaceX’s published AI1 design spec, a full constellation would draw 175 gigawatts just for computing.
Published 2026-11-26 · 4 minute read
MacroShed
What the FCC authorized
If SpaceX deploys all one million Starmind satellites and each matches its published AI1 design, the computers on board could draw 175 gigawatts on average. That is a very large amount of power, even by the standards of terrestrial AI infrastructure. It comes from multiplying two numbers with different meanings: the number of satellites the FCC has conditionally authorized and the average compute payload SpaceX has specified for one design.
The FCC’s November 25 order covers Starmind’s planned low Earth orbits and grants backup radio links for telemetry, tracking and command. The satellites are meant to communicate primarily over optical links. The grant calls for one operating satellite by November 2033 and 100,000 by November 2035 to keep the authorization on those terms. Some requests for disposal above 600 kilometers remain deferred. These are license conditions, not SpaceX’s promised launch dates.
Source: FCC Starmind authorization and milestones, DA 26-1273Source: SpaceX AI1 design specifications
The power calculation
SpaceX gives the AI1 a 75-meter wingspan and lists a compute payload of 175 kilowatts on average and up to 250 kilowatts peak. One million times 175 kilowatts is 175 gigawatts. Using the peak figure gives 250 gigawatts if every unit reaches peak together. The average figure is more useful when comparing a continuous load. At just one percent of the authorized count, the same multiplication gives 1.75 gigawatts, close in scale to the 1.7 gigawatts of terrestrial nameplate compute capacity SpaceX reported at the end of September.
The IEA’s 2026 presentation puts worldwide electricity use by AI-focused data centers in 2025 at roughly 150 terawatt-hours. Divide by the hours in a year and that’s about 17 gigawatts on average. Even the IEA’s 2030 projection for all data centers, about 950 terawatt-hours, comes to 108 gigawatts on average. Both terrestrial figures include facility overhead. The orbital estimate is power available to the computing payload, assuming every satellite delivers the design average. This is a comparison of power across scenarios and dates; it cannot tell us how many tasks the chips will complete.
Source: SpaceX AI1 design specificationsSource: IEA Key Questions on Energy and AI: AI-optimised data centers, 2025/2030Source: IEA April 2026 outlook for global data center electricitySource: SpaceX Q3 2026 results, SEC Exhibit 99.1
What would make the first satellites useful
Google has already run Gemma 4 on a data center class TPU in orbit. Its next heavy-lift mission, with Blue Origin, targets early 2029 with roughly a rack of capacity per satellite. SpaceX has its own launch and satellite networking business, and it already sells compute on Earth. Those capabilities matter earlier than the million-satellite number does. A customer who can send a batch of inference jobs to one satellite does not need SpaceX to network thousands of them into a single training cluster first.
Getting useful work out of the hardware matters more than collecting cheap sunlight. The system has to pay to launch or replace a computer, radiate its heat, move the data and keep working through radiation and outages. Those costs are why Google’s research makes Earth-like power economics conditional on much cheaper launches. The most useful early comparison will be the cost and availability of a completed job in orbit versus a job on Earth. For a buyer who cannot get powered capacity on time, earlier delivery may make orbit competitive before it is the cheapest option.
Source: Google reports first Suncatcher TPU response from orbitSource: Google and Blue Origin heavy-lift Suncatcher plansSource: Google Research: orbital AI infrastructure economic assumptionsSource: SpaceX Q3 2026 results, SEC Exhibit 99.1Source: SpaceX AI1 design specifications
The connection to a Dyson swarm
A Dyson swarm is a collection of separate machines that capture energy from a star. Starmind would be a very small step toward that idea. It would use the electricity where it is collected and send the results back to Earth. That is an attractive place to start: moving information is already a business SpaceX knows, and a useful satellite can earn revenue long before there are enough of them to change the planet’s energy budget.
Source: SpaceX AI1 design specificationsSource: Freeman Dyson, Search for Artificial Stellar Sources of Infrared Radiation
Find your route into the future.
Compare the business, evidence and risks behind 20 companies and six funds.
Open the Exposure Atlas →Sources and method
Primary sources establish the described products, reported figures and announcements. Our interpretation of exposure and risks is editorial analysis. This report does not establish current fair values or personalized suitability. Financial periods and holdings dates are shown explicitly.
- FCC Starmind authorization and milestones, DA 26-1273 ↗
2026-11-25
- SpaceX AI1 design specifications ↗
Retrieved 2026-11-26
- IEA Key Questions on Energy and AI: AI-optimised data centers, 2025/2030 ↗
2026-04-16
- IEA April 2026 outlook for global data center electricity ↗
2026-04-16
- SpaceX Q3 2026 results, SEC Exhibit 99.1 ↗
Quarter ended 2026-09-30
- Google reports first Suncatcher TPU response from orbit ↗
2026-10-30
- Google and Blue Origin heavy-lift Suncatcher plans ↗
2026-11-19
- Google Research: orbital AI infrastructure economic assumptions ↗
2025-11-04
- Freeman Dyson, Search for Artificial Stellar Sources of Infrared Radiation ↗
1960-06-03
Updates and corrections
2026-11-26 — Initial publication. Fleet power is a design scenario calculated from the authorized count and SpaceX’s published AI1 specification.
No company or fund paid for this report. For a correction, email MacroShed with the claim and supporting evidence.
More from MacroShed
Dell sold the servers. Wall Street sold Dell.
Dell’s blowout quarter and next-morning selloff expose a market treating the businesses that pay for AI and the businesses that get paid to build it as one trade.
5 minute read · Read report →
AI’s next great product is a better way to build AI
The feedback loop is taking shape in training kernels, research workflows and algorithm design. Its economic importance arrives before the fully autonomous laboratory.
6 minute read · Read report →